 
 							
						The ground has been staked, and the foundation will be dug in a few days!
GVL Excavating will have their equipment on site in a few days. Shortly after, the forms will be set and the concrete foundation will be poured by AAA Poured Walls.
Stop by the site, or call/email us for the latest updates!
Spica Real Estate, 2575 84th St. SW, Byron Center, MI 49315 | Copyright 2017 Powered By Arbi-Design - All Rights Reserved